Carbon Corridor

Notes on carbon markets and industrial transition

Sections

Reaching the editors, and what happens after you write

Getting started with Carbon Corridor usually means one of two things: you want a corridor note explained, or you have data from your own fleet that deserves a second pair of eyes. Both routes go to the same small editorial desk, so replies come from someone who actually reads the spreadsheets.

Corridor tips and method questions

Send route notes, telematics extracts or a pointer to a reporting problem on the N3, N1 or the Richards Bay line. Include the corridor, the period covered and what you already tried. Vague tips take longer to place.

info@transportcarbon.com

Response times

Method questions and corrections are answered within two working days. Corridor tips that need verification against factor sets or terminal data can take up to a week, especially around month-end when hauliers are closing their own reporting.

Phone the desk on +27 33 487 7509 for time-sensitive corrections.

Post and visits

Written material, printed load charts and interview transcripts can be posted to the editorial address. Depot and terminal visits are arranged in advance and only when a corridor story is already in progress.

130 Adriaan Bypass Apt. 168
Louiseport, GP 6979

Before you write, the common questions are already answered: Read the FAQ Contact the editors

How a corridor note gets built

Every dispatch in Transport Carbon Review follows the same route, from a raw tip or telematics pull to a published method note. Nothing skips the checking stage, and nothing gets published without a source we can name.

  1. Step 01

    Corridor tip or data pull arrives

    A haulier sends a fuel anomaly on the N3, or an editor pulls a month of telematics from a Richards Bay container flow. Either way, we log the source, the period and the vehicle class before anything else happens.

  2. Step 02

    Scope and method agreed

    We decide which emission factor set applies, whether the leg is measured in tonne-kilometres or diesel litres, and which depot consolidations count. Ambiguous boundaries get written down, not smoothed over.

  3. Step 03

    Numbers checked against the road

    Gradient, idling time and load splits on the escarpment descent rarely match a flat average. We compare the spreadsheet against driver logs and weighbridge slips before trusting a figure.

  4. Step 04

    Draft note and interview transcript

    The method note is drafted alongside the transcript from whoever supplied the data. Where a claim cannot be traced to a source, it is cut rather than softened.

  5. Step 05

    Editorial review and correction window

    A second editor checks factor selection, unit consistency and any sustainability reporting claim that would not survive an audit. Contributors get a short window to correct figures before publication.

  6. Step 06

    Published and logged for follow-up

    The note goes out in the weekly dispatch with its spreadsheets attached. We keep a running log of open questions, so a corridor piece can be revisited when new telematics data lands.

If you want the background on who runs this process, start with the editorial team, or send a corridor tip directly to the editors.

Cookie settings

We use cookies to keep the site reliable, remember basic choices, and understand which pages are useful. You can accept, reject, or review the settings before continuing.